Fairway Hills Unit 23B SOLD

Unit 23B has been sold. So, we are ready to start construction on 23A & 23B with a deposit on at least one side. We’ve already done the excavation and pulled permits, so we are ready to start as soon as the weather breaks to pour foundations. If we start around...

Riverwatch 3 Construction Underway

The foundations, frost walls and floor slabs will be completed the week of January 10th, with framing ready to follow. Unit A is sold, Unit B is available. 4 Bedrooms, 3.5 baths, 2 car garage, downtown on the River! One of a kind, and only one available. Make your...

Spring Construction at Fairway Hills

With the sale of Unit 23B pending, we are taking deposits for Townhomes to be constructed on Sites 22A and 23B when the weather breaks this spring. The site has been excavated and permits have been pulled, but we won’t start until at least one deposit is in...